MILL

OEM site screen · screening-grade

v1

Factory-siting screen for a robot or humanoid OEM site team: SITE climate is public MODELED dry-bulb (a factory-floor labor/HVAC screen, not a data-center campus); PLANT acres, MW, and rail are operator CURATED and never invented.

Site Modeled

ERA5 dry-bulb via Open-Meteo. Last ~365 days ending 5 UTC days ago. Not live weather, not wet-bulb, not free-cooling.

Comfort band · dry-bulb to °C inclusive Default 5–27 °C. Factory-floor labor/HVAC screen, not free-cooling, not wet-bulb. Heating <5 °C and hot >32 °C are independent notes.

Plant Curated

Typed by the OEM site team. Empty stays empty. Completeness is a fill count, not a score.

rail-logistics · empty until you pick
Power letter, interconnect, water rights · empty until you pick · not a queue or registry
power letter · empty until you pick · not a queue
interconnect · empty until you pick · not a queue scrape
water rights · empty until you pick · not a registry
Modeled · ERA5 reanalysis · Open-Meteo
No series yet. Enter a point and Go. Hours are never invented. Plant fields start empty.
As-of — · ERA5 ingest lag ~5 UTC days
Calendar — of — calendar hours · % of resolved dry-bulb
License Open-Meteo public archive (local evaluation). Weather data by Open-Meteo.com
Climate-band hours in window
Hours where MODELED dry-bulb is inside the factory-comfortable band (inclusive). Labor/HVAC climate screen. Not free-cooling for IT. Not wet-bulb.
Heating <5 °C: —. Hot >32 °C: —.
0 of 3
Plant completeness
acres / MW / rail-class · not a score
Optional process-water gpm, power letter, interconnect, and water rights are not in the count. Empty fields stay empty.
screen: incomplete
Fit note · a screen, not a stamp
acres empty · target MW empty · rail-logistics empty · SITE hours missing
Screen rule — not a certificate

screen: plant-plausible only if acres ≥ 200 and target MW ≥ 50 and rail-logistics is answered and SITE hours exist. Climate-band ≥ 40% of resolved hours is a MODELED note, not a gate. Else incomplete if SITE hours missing or plant completeness < 3 (acres / MW / rail-class; unknown MW is incomplete, never a fail); constrained if SITE hours exist, completeness is 3, and a hunch fails. The 200 acre / 50 MW / rail-answered cutoffs are this page’s v1 screen (hunches), not a defended industrial standard.

Holes — listed, not filled. Power-on-a-timeline is how real sites fail; Mill is not a queue product. An operator may type a power-letter, interconnect, or water-rights class; Mill still does not scrape a queue or registry. Flood is a public NFHL pin query; empty coverage / timeout / error stays a gap.

Screening-grade. Not underwriting. Not a site-selection stamp. Not an interconnect-queue product. Not a factory design. SITE hours are ERA5 grid-cell reanalysis via Open-Meteo, not a weather station on the plant. Climate-band is a labor/HVAC dry-bulb screen — not free-cooling for IT, not wet-bulb. Flood is a public FEMA NFHL pin query — not a survey, not a pad study, not FIT. PLANT numbers are whatever the operator typed — Mill does not fetch CoStar, LoopNet, queues, or any incentive database. The FIT cuts are v1 hunches shown on this page, not industry fact. On mill.tools, ERA5 is fetched via same-origin /api/era5 (Open-Meteo customer archive; the API key is not in this page). Local evaluation may use Open-Meteo’s public archive. Weather data by Open-Meteo.com